Solid
partitions.
Intertenancy, corridor, shaft and service partitions in reinforced AAC: non-combustible, 34 to 77 dB, and as narrow as 185 mm with services.
Knock on it.
It is a wall.
System P is the reinforced AAC partition: 75 to 250 mm panels, tongue-and-groove, set by robot or by hand, fire-rated up to four hours and six metres high. Add plasterboard and wool for up to 77 dB. Narrowest system with concealed services on one side: 185 mm.
Partitions.
Intertenancy, corridor, shaft and service partitions: non-combustible, and as narrow as 185 mm with concealed services on one side.
| 75 mm | 3 m · 180 min · 34 dB Up to 67 dB with linings |
| 100 mm | 4 m · 240 min · 40 dB (tested) Up to 70 dB with linings |
| 150 mm | 5 m · 240 min · 46 dB Up to 74 dB with linings |
| 200 mm | 6 m · 240 min · 48 dB (45 tested bare) Up to 77 dB with linings |
| 250 mm | 6 m · 240 min · 50 dB On request |
Max height · fire · sound, coated. STC values are simplified calculations unless marked tested. Linings: two plasterboard layers, glass or rock wool.
The numbers
behind the system.
Values from GGI technical data sheets. Project-specific calculations, span tables, fire certificates and drawings on request.
| 100 A | Coating and paint 40 dB, tested |
| 100 B | Two plasterboard layers 48 dB, tested |
| 100 C | Two boards and glass or rock wool 61 dB, tested |
| 100 E | Two boards and glass wool 65 dB, tested |
| 100 F | Two boards, rock wool and glass wool 70 dB |
| 100 G/H | Double panel, void or wool between 50 / 55 dB |
| 200 A | Coating and paint 48 dB |
| 200 B | Two plasterboard layers 54 dB |
| 200 C | Two boards and glass or rock wool 67 dB |
| 200 F | Two boards, rock wool and glass wool 77 dB |
| 200 G | Double panel, void or wool between 56 / 65 dB |
Where it is used.
- Speed
Panels ordered to length; one trade installs the whole partition; no waiting for windows
- Compliance
The AAC leaf is the fire-rated element; no dampers on the partition; boards need not pass the ceiling
- Floor space
185 mm with services on one side, the narrowest system on the market
- Solidity
Cannot be cut through; feels like masonry; carries fixings anywhere
- Robot installation
Compact and long-panel robots, crew of two, a panel every six minutes
- Sustainability
Quarter of the raw material of concrete; production waste recycled
984
Rooms partitioned at Al Baker Towers · Sofitel and Novotel
Hotel partitions in AAC: intertenancy walls at 48 dB coated, shaft and corridor walls fire-rated for four hours, finished direct.
Delivered
in System P.
- ABK, Doha
- Al Baker Towers
- Gulf Warehousing
- PPP school corridors
- Hilton City Center
- Lusail Stadium
- All projects →
Start a
project.
Send us the drawings, the quantities or just the idea. A GGI engineer replies with a system, a programme and a price.