Panels 1 to 3.2 m, up to 300 kg
| Size (L × W × H) | 880 × 989 × 1360 mm |
| Weight | 800 kg |
| Travel and climb | 500 mm/s, 8°, 30 mm steps |
| Battery | 8 h run, 4 h charge |
| Control and safety | Wireless tablet app; alarm and e-stop |
Fully electric wall-panel installation robots lift, carry, stand and set each panel while the crew guides it from a tablet. Mobile printers draw the wall in concrete. No heavy lifting by hand.
A crew of eight sets about 80 wall panels a day with one small crane. A robot and two people pick, carry and set a panel every six minutes, climb to every floor, and run eight hours on a charge with no fumes.
*From a joint LTA and BCA productivity study in Singapore. Manufacturer's figures.
The robot lifts, carries, stands and sets the panel; the crew guides it from a tablet. Two sizes cover every reinforced AAC panel we make, from 1 m partitions to 6 m cladding.

| Size (L × W × H) | 880 × 989 × 1360 mm |
| Weight | 800 kg |
| Travel and climb | 500 mm/s, 8°, 30 mm steps |
| Battery | 8 h run, 4 h charge |
| Control and safety | Wireless tablet app; alarm and e-stop |

| Size (L × W × H) | 1600 × 1200 × 1800 mm |
| Weight | 1,200 kg |
| Travel and climb | 500 mm/s, 8°, 40 mm steps, turns on the spot |
| Battery | 8 h run, 4 h charge |
| Control and safety | Wireless tablet app; alarm and e-stop |
Any reinforced AAC panel system: tongue-and-groove partitions between RC columns, cladding fixed to steel frames, load-bearing walls in the complete AAC building.
75 to 250 mm panels, fire-rated to four hours, six metres high. A panel every six minutes.
6 m panels fixed vertically or horizontally outside steel or concrete frames.
Load-bearing panels in accommodation, villas, hotels and schools.
The MaxiPrinter unfolds in thirty minutes, prints walls up to six metres, then folds onto its tracks and drives to the next room. At School 08, two work side by side.
3D concrete printing →

Tell us the panel count and the floors. We will tell you how many robots, how many people and how many days.