The façade
is the wall.
Reinforced AAC panels fixed vertically or horizontally to steel or concrete frames: malls, warehouses, arenas, schools and towers.
Fixed to the frame.
Coated direct.
No plaster.
System C fixes 6 m reinforced panels outside steel or RC frames as non-load-bearing cladding. One panel replaces blockwork, plaster and insulation, carries 162 km/h wind, and takes coating directly. Most of the malls in Qatar are clad this way.
Cladding.
Reinforced panels fixed vertically or horizontally to steel or concrete frames as non-load-bearing cladding, from warehouses and malls to high-rise offices. Coating goes on directly.
| 100 mm | 3 m external, 4 m internal 100 kg (3 m), 130 kg (4 m) |
| 150 mm | Up to 6 m 300 kg |
| 200 mm | Up to 6 m 400 kg |
| 250 mm | Up to 6 m 500 kg |
| 300 mm | Up to 6 m On request |
The numbers
behind the system.
Values from GGI technical data sheets. Project-specific calculations, span tables, fire certificates and drawings on request.
| External load | 120 kg/m² minimum 140 kg/m² at 162 km/h wind |
| Internal load | 40 to 120 kg/m² Horizontal |
| Compressive strength | 4.0 MPa To QCS 2010 |
| Fire resistance | Min. 4 hours At 100 mm |
| Thermal | U 0.55 at 200 mm R 1.8 with 20 mm finish |
| Sound | 40, 46, 48 dB STC 100, 150, 200 mm |
| Seating levels | Walls and slabs, spans to 40 × 20 m halls Theatres, cinemas, stadiums |
| Acoustic barriers | 100 to 400 mm NRC 0.15 bare; 48 dB at 200 mm |
| Boundary walls | Vertical to 2.4 m; horizontal 6 m span, 9 m high On steel or RC posts |
| Partitions | 75 to 250 mm See System P |
Values from GGI technical data sheets; wind and thermal studies on request.
Where it is used.
- Malls
Villagio, Landmark, Lulu (Al Khor, Gharafa, Mesaimeer, Abu Sidra), Wathnan, City Center, Hyatt Plaza
- Towers
Lusail Commercial Boulevard, 18 buildings; Yasmeen City; Fox Hills Jefferson
- Schools
10 of 14 PPP schools; Vision International; Al Muftah School
- Arenas and stadiums
QNOC Al Khor and Lusail arenas; Gharafa and Rayyan stadium seating
- Warehouses
Gulf Warehousing at Bu Sulba, Abu Samra and the Industrial Area
- Campus
Qatar Foundation; Doha Oasis; Al Waab residential
10 of 14
Qatar PPP Schools Programme · Ashghal
AAC cladding supplied and installed on ten of the fourteen schools; at School 08, AAC and 3D printed walls share one building.
Delivered
in System C.
- Lusail Commercial Boulevard
- Qatar Foundation
- Doha Oasis
- Lulu, Abu Sidra
- Landmark Mall
- Villagio Mall
- Hyatt Plaza
- Al Khor Arena
- Vision International School
- All projects →
Start a
project.
Send us the drawings, the quantities or just the idea. A GGI engineer replies with a system, a programme and a price.