Built for
thousands.
Complete AAC accommodation buildings up to G+4: wall panels, floor and roof slabs, no RC columns or beams.
One building a month.
Every wall AAC.
System A is the complete AAC building: reinforced wall panels carry reinforced floor and roof slabs on an RC raft or grid-beam foundation. No columns, no beams, no plaster. It has housed 70,000 workers at Al Wakra and 7,000 families at Barwa Madinatna.
Accommodation.
Complete AAC buildings up to G+4: wall panels with floor and roof slabs on an RC raft or grid-beam foundation. No RC columns or beams; only coating and paint. About one building a month.
| A 50 – A 100 | Ground floor, 12 rooms, 500 m² 50 to 100 workers |
| A 200 | 48 rooms, 2,000 m², 3 RC staircases 200 workers |
| A 300 | G+2, 72 rooms, 3,000 m² 300 workers |
| A 500 – A 1000 | G+4, 120 rooms, 5,000 m² 500 to 1,000 workers |
| A 70,000 | G+2, 1,404 units, 16,848 rooms, Al Wakra 70,000 workers |
| A 7,000 | G+4 family housing, Barwa Madinatna 7,000 apartments |
The numbers
behind the system.
Values from GGI technical data sheets. Project-specific calculations, span tables, fire certificates and drawings on request.
| Wall panels | 100 to 300 mm, up to 6 m Reinforced, load-bearing |
| Floor and roof slabs | 150 to 250 mm, up to 6 m span 350 kg/m² floors; 250 kg/m² roofs |
| Foundation | RC raft 20 to 45 cm Or grid beams 25×45 to 45×65 cm |
| Stairs and lift shafts | Cast in situ, precast or steel Fixed before or after the AAC |
| Clear height | 2.6 to 3.0 m Parapet 0.3 to 1.4 m |
| Wall panels | One panel every 6 minutes Robot and crew of two |
| Floor and roof slabs | 120 a day Set by crane |
| Building | About one a month A 300 type, G+2 |
| Finish | Coating and paint only No plaster |
Values from GGI technical data sheets; project-specific calculations on request.
Where it is used.
- Barwa Madinatna
339 buildings, 7,000 apartments, G+4
- Al Wakra, Argentine Village
1,404 units, 16,848 rooms, G+2
- Six Construct, Al Wakra
40 buildings of labour accommodation
- Doha Steel Fab
Staff and labour accommodation, industrial area
- Street 1, Industrial Area
G+2 staff accommodation
- Qatar Airways
56 staff and accommodation buildings
70,000
Workers housed at Al Wakra · G+2 · 16,848 rooms
Complete AAC walls and slabs for 1,404 units, built for the FIFA 2022 labour city and finished with coating and paint only.
Delivered
in System A.
- Barwa Madinatna
- Barwa Argentine Village
- Six Construct, Al Wakra
- Street 1, Industrial Area
- Qatar Airways staff housing
- All projects →
Start a
project.
Send us the drawings, the quantities or just the idea. A GGI engineer replies with a system, a programme and a price.