Lusail Commercial Boulevard
Mixed-use · Lusail
05AAC

Lusail Commercial Boulevard

AAC cladding panels on 18 buildings

2019–2022AAC systems C
01Scope

What GGI
delivered.

Reinforced AAC cladding panels fixed to the frames of eighteen buildings along the boulevard that opened for the 2022 World Cup. One panel replaced blockwork, plaster and insulation, and took the coating directly.

LocationLusail
SectorMixed-use
Years2019–2022
Buildings18
SystemC · Cladding
Completed2022
03Contact

Start a
project.

Send us the drawings, the quantities or just the idea. A GGI engineer replies with a system, a programme and a price.