Mixed-use · Lusail
05AAC
Lusail Commercial Boulevard
AAC cladding panels on 18 buildings
01Scope
What GGI
delivered.
Reinforced AAC cladding panels fixed to the frames of eighteen buildings along the boulevard that opened for the 2022 World Cup. One panel replaced blockwork, plaster and insulation, and took the coating directly.
| Location | Lusail |
| Sector | Mixed-use |
| Years | 2019–2022 |
| Buildings | 18 |
| System | C · Cladding |
| Completed | 2022 |



02Related
More in
the field.
03Contact
Start a
project.
Send us the drawings, the quantities or just the idea. A GGI engineer replies with a system, a programme and a price.


